About these calculatorsConstruction calculators for the job in hand
This page brings together 13 construction calculators for the jobs that come up on site and around the house: working out materials, setting out fencing, checking a ramp, costing a steel beam, and planning a ceiling or a floor. Every calculator works the same way. Enter the measurements you have, and read off the answer you need to order materials, set a depth, or check a gradient. The results are planning figures, not a substitute for a professional check where one is needed.
Materials: concrete, tarmac and sand and cement
Most jobs start with a quantity. The concrete weight calculator turns a volume into a weight, because it is ordered by volume and carried by weight: fresh concrete weighs around 2,400 kilograms per cubic metre, so a single cubic metre is a serious load for a barrow. The 4 to 1 sand and cement calculator works out a mortar and screed mix, and the tarmac calculator works out how much surfacing a drive or path needs from its length, width and depth. Measure in metres, allow for compaction, and add a small amount for waste: a little left over beats running short halfway through a pour.
Fencing that stays upright
A fence fails at the posts, not at the panels, so the fence post depth calculator starts with the one-third rule: bury one third of the post, so a 1.8 metre fence needs a post 2.4 metres long with 600 millimetres in the ground. The hole should be two to three times as wide as the post, with a 150 millimetre frost buffer for UK ground. Posts go in at 1.8 metre centres, and a 300 millimetre wide hole 600 millimetres deep needs about 42 litres of concrete, roughly five 20 kilogram bags of Postcrete, mixed 1 to 2 to 3 of cement, sand and aggregate. The feather edge fencing calculator works out boards, rails and posts for a close-board fence.
Ramps and access
The ramp calculator checks a gradient against Approved Document M, the part of the Building Regulations that covers access. The steepest gradient allowed is 1 in 12, and only for a short flight of up to 2 metres, with a rise of no more than 166 millimetres. Longer flights must be gentler: 1 in 15 for a 5 metre flight, with a rise of no more than 333 millimetres, and 1 in 20 for a 10 metre flight, with a rise of no more than 500 millimetres. The calculator also works out the length of ramp a rise needs, so a 450 millimetre step needs 5.4 metres of ramp at 1 in 12, plus landings. Ramps also need handrails, a non-slip surface, and a check with building control.
Roofs, ceilings and floors
The roof batten spacing calculator works out the gauge for tiles or slates, which depends on the size of the tile and the pitch of the roof: the spacing decides whether the roof sheds water properly. The suspended ceiling calculator works out the grid and the number of tiles for a room, and the underfloor ventilation calculator works out the air bricks a suspended timber floor needs. Vents go on opposing walls so air moves under the floor and keeps the joists dry. The square feet to square metres converter sits alongside them for plans and listings that still use imperial measurements: one square foot is 0.092903 square metres, and one square metre is 10.7639 square feet.
Steel beams and costs
The steel beam cost calculator gives a planning price for a beam, based on its size and length. That is useful for budgeting, but a cost calculator cannot size a beam: the size of a steel beam depends on the load it carries, the span, and the walls it bears on, and that is a job for a structural engineer, with the design checked by building control. Never size a beam from a calculator alone.
Who they are for
These calculators are for DIYers planning a weekend job, for builders pricing a small project, and for homeowners who want to check a quote against their own figures before agreeing to it.
How to get a useful answer
Measure twice and enter the measurements in the units the calculator asks for. Check the units before you trust the answer: centimetres entered as metres will be wrong by a large factor. Treat every result as a planning figure, confirm it on site, and allow for waste and for the ground being less even than the drawing. Where a job affects the structure of a building, get a professional check before you start.
Construction FAQ
Answers to the questions people ask most about building, fencing and materials.
One third of the post should be in the ground. A 1.8 metre fence needs a post 2.4 metres long, with 600 millimetres buried. Go deeper in soft ground or in a very exposed spot, and add a 150 millimetre frost buffer for UK ground.
A hole 300 millimetres wide and 600 millimetres deep takes about 42 litres of concrete, which is roughly five 20 kilogram bags of Postcrete. The hole should be two to three times as wide as the post, and the mix for setting posts is 1 to 2 to 3 of cement, sand and aggregate.
Under Approved Document M, the steepest gradient is 1 in 12, and only for a flight of up to 2 metres, with a rise of no more than 166 millimetres. Longer flights must be gentler: 1 in 15 for a 5 metre flight and 1 in 20 for a 10 metre flight. Ramps also need landings, handrails and a non-slip surface.
Posts go in at 1.8 metre centres, which matches the standard UK fence panel length. Spacing them further apart saves posts but leaves the panels unsupported, and a panel that sags will not last.
No. The steel beam cost calculator gives a planning price only. The size of a beam depends on the load it carries, the span and the walls it bears on, so it must be worked out by a structural engineer and checked by building control. Never size a beam from a calculator alone.
Fresh concrete weighs around 2,400 kilograms per cubic metre. That is why a single cubic metre is a serious load to move by barrow, and why it is worth ordering ready-mixed concrete for anything bigger than a few post holes.