Concrete Post Mix Calculator
Instantly work out how many bags of post mix or postcrete you need to set your fence posts, based on hole size, post size, and number of posts.
The concrete weight calculator can help you work through the same figures.
For more detail on this, see the fence post depth calculator.
Calculate Your Post Mix Bags
Enter your hole dimensions, post size, and number of posts below to get an instant estimate of how many bags of post mix concrete you’ll need.
Post Mix Calculator
Enter your dimensions to see the estimated bags needed
Measure across the widest point of the dug hole
Typically one third of the post’s above-ground height
Standard square timber posts are usually 75mm or 100mm
Check your product packaging for the exact yield
Estimated Bags Needed
Calculated from your hole and post dimensions
Getting the Most From the Concrete Post Mix Calculator Detailed Guide
What this calculator does
People look up concrete post mix for many different reasons, and the Concrete Post Mix Calculator was designed to suit all of them. It accepts straightforward inputs, responds instantly, and presents the answer in plain language rather than confusing jargon.
Who it helps
From architects and designers, self-builders and builders and contractors, the people who use the Concrete Post Mix Calculator share one goal: a trustworthy figure without wasted effort. Think about moments such as ordering the right amount of stock, comparing two design options and planning a loft or extension. Each one becomes simpler once concrete post mix has been worked out clearly.
Getting accurate results
Accuracy begins before you press the button. Take a moment to keep all measurements in one unit, and whenever possible confirm requirements with local building guidance. Small preparations like these usually matter more than any later adjustment to concrete post mix.
Mistakes to avoid
People often go wrong by ignoring thickness or depth or using nominal sizes instead of actual sizes. Neither is hard to avoid once you know to look for it, and a quick review before you rely on the answer usually catches both.
Reading your result
A good habit is to sense-check every answer. Ask whether it is the right size, whether mix and concrete have been entered sensibly, and whether rounding could be hiding something important. If you are unsure about a value, try a low and a high estimate and see how far apart the answers are. Because the calculation runs instantly in your browser, you can test as many scenarios as you like without any limit. Clear inputs lead to clear answers, so take a few extra seconds to read each label on the calculator before typing. We update our tools regularly, so check back for improvements to concrete post mix and related construction calculators.
A note on accuracy
This Concrete Post Mix Calculator gives planning estimates only. Confirm final quantities on site and follow building regulations and professional advice for structural or safety-critical work.
Post Mix Bags Per Post Reference Chart
Approximate number of 20kg post mix bags needed per hole, based on a 100mm square timber post and standard hole sizes.
| Hole Diameter | Hole Depth | Approx. Volume Needed | 20kg Bags Per Post |
|---|---|---|---|
| 250mm | 450mm | ~0.017 m³ | 2-3 bags |
| 300mm | 600mm | ~0.033 m³ | 4-5 bags |
| 350mm | 600mm | ~0.048 m³ | 6-7 bags |
| 400mm | 750mm | ~0.084 m³ | 10-12 bags |
Related: concrete weight calculator, fence post depth calculator.
Post Mix Concrete FAQ
Everything you need to know about calculating and using post mix concrete for fence posts.
For a standard fence post hole of around 300mm diameter and 600mm deep, you typically need 1 to 2 bags of 20kg post mix concrete per post, depending on the post size and how deep the hole is.
As a general rule, bury the post to roughly one third of its total above-ground height, with a minimum depth of 450-600mm for standard garden fence posts. Taller fences and exposed, windy sites need deeper holes.
Most fast-setting post mix products are poured dry directly around the post and then soaked with water, which triggers the setting reaction. Always check the manufacturer’s instructions, as some traditional concrete mixes need to be mixed with water before pouring.
Fast-setting post mix typically sets firm enough to hold a post upright within 10 to 30 minutes, though it can take a further 24 to 48 hours to fully cure before attaching fence panels or rails.
